Free Demo Licence

DigitalTrains™ were approached by Oleo who between 2017 and 2022 had completed the design, manufacture, and installation of 29 Friction Sliding Buffer Stops during Orange Line Phase 1.

However, in 2025 the regulatory climate significantly changed after several high profile rail industry incidents across the region. In response, the Thai government launched its most stringent High-Level Safety Audit ever conducted. Oleo were required to re-validate their systems under a drastically elevated safety framework.

DigitalTrains™ were appointed to analyse the energy absorption performance of Oleo’s pure friction buffer stops and wheel stops under the different conditions specified by the customer.

Download the full Case Study from the link above.